1
/
of
8
Moto Watchdog
Wired GPS Tracker for Vehicles, No Subscription with Real-Time Location, Easy Install, Speeding Monitoring, Route History, Geofence, for Fleets & Families, USA, Moto Watchdog
Wired GPS Tracker for Vehicles, No Subscription with Real-Time Location, Easy Install, Speeding Monitoring, Route History, Geofence, for Fleets & Families, USA, Moto Watchdog
Regular price
$259.99 USD
Regular price
$779.99 USD
Sale price
$259.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Brand: Moto Watchdog
Color: Black
Features:
- [No Subscriptions] – Avoid adding another subscription you might forget about. We are the only company that offers a car GPS tracker with with no subscriptions, activation or hidden fees ever.
- [No Battery needed] - Unlike most trackers that need to be charged every few days, this one runs directly off your vehicle's power. Device goes to sleep a few minutes after the ignition cuts off. Set it and forget it.
- [Quick Installation] - Simple setup with just two wires: red (positive) and black (negative). You can also connect the orange wire to detect when the vehicle is on (optional). The yellow wire is for a fuel relay feature that’s not used right now. Fuse included, fuel relay not included
- [Ultimate Tracking Precision] – Real-time location tracking with instant alerts, customizable geofencing, and push notifications. For vehicles, personal items, and loved ones.
- [Wide Compatibility] – Seamlessly works with Web/Desktop, iOS 18+ or Android 10+. Whether you're using the latest iPhone or an Android device, our GPS tracker pairs effortlessly through our mobile app for real-time tracking, alerts, and control—right from your pocket.
- [Unbounded Tracking] - Works in 140+ countries including US, Canada and Mexico. Please contact before purchasing if you're not sure if your country is supported.
- [Effortless Setup] - Track a fleet of multiple GPS devices using a single screen.
model number: Hardwire
Part Number: KB-KNZS-2HXD
EAN: 0787303472825
Package Dimensions: 3.9 x 3.3 x 3.2 inches
Share
